Data Centre, Frankfurt, Germany

FRA-1 is a greenfield-site of 36,000 m2 located on a 2.6-hectare site in the heart of Europe’s leading data hubs in Frankfurt (am Main). At full capacity it is scheduled to provide 27 MW of power from 100% renewable sources in 9 data halls.

  • Chilled Water System: Supply, Installation & Commissioning of Chilled Water Plantroom & System Pipework serve the Data Halls in Module No 1, 2, 3
  • Air Conditioning Systems: AC Installation of Pipework from Condensers and Chillers...

Read More

Kerrygold, Mitchelstwon, Cork, Ireland

Extension to Kerrygold Park, Mitchelstown, Co. Cork

  • Production systems including MTHW, LGHW, Chilled water and Domestic water systems
  • Mixture of stainless steels and carbon pipework
  • Installation of MTHW boiler and system operating at 115degees flow...

Read More

MSD, Dunboyne, Ireland

MSD Dunboyne Biologics is a state-of-the-art biologics manufacturing facility.

This site in Co. Meath is the latest addition to the MSD Ireland family involved the construction of a 19,000m2 building and the internal fitout for admin, support, logistics, utility, and warehouse spaces...

Read More

Primark, Calais, France

Calais was a full mechanical installation carried out by our subcontractor ClimateAir consisting of two retail floors and one Back of House office area.

  • We installed two heat pumps for heating and cooling of Air to the retail floors on the roof.
  • We installed 5 Air handling Units, 4 for the retail floors and 1 for the Back of House (BOH).
  • We installed a VRF system to supply Air Conditioning to the BOH and associated offices...

Read More

Four Park Place, Dublin, Ireland

Full Mechanical Services installation of Office Building

Supply and install the following

  • Full mechanical services install to all Floor complete with Roof top Packaged plantroom Chillers, Electric PV Panels, Smoke Ventilation System, Toilet Extract and basement plantrooms and incorporating install of shower block with Commercial office building Cat A fitout to each floor...

Read More

Lidl Distribution Centre, Mullingar, Ireland

The project comprises of the construction of a new extension for the LIDL Distribution Centre and upgrade of the existing building, including Warehouse, Administration Block, Goods In Building, Goods Out Building, Returns office, transport office, Gate House, (approx. 60,000m²), carpark and associated site works...

Read More

LinkedIn, Dublin, Ireland

Full mechanical services install to 5th Floor complete with kitchen basement and roof install along with Commercial office building

  • Heating and Chilled water pipework
  • Supply and extract Ventilation...

Read More

Three Park Place IDA, Dublin, Ireland

Mechanical Services Installation – fit-out 3rd, 6th, 7th & 8th floor retrofit

  • Strip out all existing HVAC services and installation of new fully coordinated mechanical
  • Remove and store 121no existing FCU’s & reinstall with 48no new FCU’s to revised HVAC installation
  • LEED Platinum project

Read More

Arkle Road, Dublin, Ireland

Lynskey Engineering Ltd carried out the mechanical services installation for Termini (3 Arkle Road, Sandyford, Dublin 18) between January 2019 and August 2020. The Main Contractor was Walls Construction Ltd. The building is a six storey over basement structure with approximately 17,000 m2 (Net Internal Area) lettable space over a 5,500 m2 basement.

Read More

Exchange Building, Dublin, Ireland

Supply and installation of Mechanical services

  • 11,000 Sqm. mechanical services installation over 7 floor office development
  • Supply and Installation of approx. 270 no. fan coil units
  • AHU’s and Extract fans

Read More

Primark, Belfast, Northern Ireland

Restoration of Primark’s 5-story flagships store in the magnificent The Bank Building. As part of this historical restoration project, Lynskey Engineering designed, installed and commissioned the complete mechanical installation including ventilation/ air conditioning, smoke control systems, fuel systems, water services and energy management systems, working closely with teams from Bennett (Construction) Ltd, JCA Architects, Linesight, Boyd Project Services, Premier Electrics.

Read More

Data Centre for NDA Client in Dublin

The project comprises of the construction of a new build data centre over two levels and a administration block to the front of the building over two levels

  • Complete installation of first fix plumbing, sanitary ware, ventilation including air handling units, supply and extract fans, ductwork, and grilles.
  • Complete installation of all above ground soil stacks and drainage...

Read More

Data Centre for NDA Client in Dublin

The project comprises of the construction of a new build data centre over two levels and a administration block to the front of the building over two levels.

Office Area -The mechanical installation for the office area of the Dub 69 Project in Grange Castle...

Read More

Cork University Hospital, Cork

Fitout of an existing room into a new vascular lab. Project was completed for Titanium Developments and Philips.

Vascular room was located in the middle of CUH hospital. specific planning had to be put into place to carry out the works without effecting the live hospital.

Read More

O'Brien Fine Foods, Co. Kildare, Ireland

O'Brien Fine Foods - Extension to production facility. Mechanical services installation including provision of specialist ventilation, Air conditioning, water and process services

Read More

Wayflyer, One Park Place, Dublin, Ireland

The project comprised of the mechanical installation and modification to the following existing services for commercial fitout.

Read More

Primark Brno, Czech Replublic

Retail fit-out

Read More

Hermitage Clinic, Dublin, Ireland

Radiology Upgrade comprising installation of 2 no. MRI’s and relocation of 1 no. CT

Read More

Data Centre for NDA Client in UK

The mechanical installation for the Data Hall & Electrical Rooms and the Office areas in Swindon (UK).

Read More

Data Centre for NDA Client in Dublin

The construction of a new two storey containing 23, 283sq.m data storage. The construction facilities include data storage rooms, electrical & mechanical plant rooms and support areas including offices and welfare facilities, loading bays, back-up generators and water storage tanks; mechanical plant, including 27 no. car parking spaces.

Read More

Primark Bratislava, Slovakia

The first store in Slovakia, in Eurovea, Bratislava and 16th store on the international market for Primark. The highly anticipated store opened to crowds of customers on 25th May 2023, as part of the unveiling of the newly extended Eurovea, now the largest shopping centre in Slovakia.

Read More