Data Centre for NDA Client in Dublin
The project comprises of the construction of a new build data centre over two levels and a administration block to the front of the building over two levels
Project Summary
- Complete installation of first fix plumbing, sanitary ware, ventilation including air handling units, supply and extract fans, ductwork, and grilles.
- Complete installation of all above ground soil stacks and drainage.
- Complete installation of 4 no VRF air conditioning systems, BC boxes and associated indoor units and controls.
- Complete Installation of an Industrial Water Pump room and Tank farm to supply water for the air handling units.
- Complete installation of a Rainwater Harvesting System consisting of a leaf filter that feeds into a 10m3 underground concrete tank witch in return feeds into a UV that kills bacteria and on into the industrial water tanks.
- Complete installation of Crac units, Heat recovery units in the electrical rooms and condensers on the roof to provide cooling in the electrical rooms.
- The crane lift of 42 no of air handling units and positioned by Lynskey Eng.
- Air handling units piped and connected with duct feed into a header duct witch in return feeds into duct runs that provide cooling for the hot aisles in the data centre.
- The crane lift of extract fans to the roof and positioned by Lynskey Eng and associated ductwork connected.
- Complete installation of a Diesel Tank bunded area consisting of fuel intake skid, fuel forwarding pumps, polishing pump and sump pumps.
- Complete installation of an above ground gas welded GB pipe to feed Diesel to each of the 17 no generators.
Project Consultants | NDA |
Main Contractor | Collen Construction |
Project Start Date | Finish Date | Fit-out Value | Lynskey Project Manager |
Mar 2022 | Mar 2023 | €7.3m | Michael McHugh/ Peter Brien |